Project No: 1- Abu Dhabi Municipality - 3rd Floor
( Through Highgate Interior Designing Company)
Problem Faced:
Project No: 2- Abu Dhabi Municipality - Ground Floor (Data Environment Centre)
( Through Bears & Sanblas Interior Designing Company - Dubai)
Problem Faced:
( Through Al Ambar Interior Designing Company - Dubai)
Note:
( Through Al Ambar Interior Designing Company - Dubai)
Note:
( Through Highgate Interior Designing Company)
- Supply and Installation of Fan coil Units - 04 Nos ( high noise)
- Supply and Installation of Chilled water pipe line connection
- Supply and installation of Thermostate.and its electrical wiring for the control
Problem Faced:
- high noise
- Drain water leakage.
- thermorstate proper setting
- No Chemical Flushing did.
- Because ceiling was 60 x 60 non perforated (like net holes ) so one reason of sound.
- diffuser used were 40 x 40 and length of ducting was less also so noise might be this reason
- sound proof liner should be used for make noise free.
Project No: 2- Abu Dhabi Municipality - Ground Floor (Data Environment Centre)
( Through Bears & Sanblas Interior Designing Company - Dubai)
- Supply and Installation of Fan coil Units - 05 Nos ( high noise)
- Supply and Installation of Chilled water pipe line connection
- Supply and installation of Thermostate.and its electrical wiring for the control
Problem Faced:
- No Chemical Flushing did.
- high noise , High Blower sound is comming (because - only one diffuser was connected with one machine and size of diffuser was 40 x 40 so it should be atleast 60 x60)
- Drain water leakage.
- thermorstate proper setting.
- Old Two number of machines were found blower motor faulty. so rewinded again ( Extra cost came - 500 rewinding + 500 for labour installation - loss of 1000 for our technician's labour cost).
- Connection of the Termostate switch was not done by the sub contractor because he said its not his job.
- Extra cost we had beared becuase old diffuser were not found any where
- Thermostate we had connected it was of other type than the required one.
- Digital Honey Well Thermostat
- Copper coils 5/8 , Teflon Tape, Three Way 1/2 H.W, Flore T 5/8, Flore reducer 1/2 x 5/8 , Flare Nut 5/8.
- Brass Connection 5/8 x 1/2 , 5/8 x 3/4,
- Brass Adaptor 1/2 x 3/4, drill bit 3.5
( Through Al Ambar Interior Designing Company - Dubai)
- Supply and Installation of Fan coil Units - 01 Nos ( high noise)
- Supply and Installation of Chilled water pipe line connection.
- Supply and Installation of Ducting (GI Ducting with grills, pnion boxes, insyallation, grills, VCDs, Flexible ducts.)
- Supply and installation of Thermostate.and its electrical wiring for the control
Note:
- Big Problem we faced Chilled Water Pipeline Chemical Flushing and Pressure Testing , Pressure value = 12 Bar( Sample were need to approve from Water Bird - we done it three time final got the success but waster lots of time
- Pressure testing was for both fire fighting and for the chilled water line.
- Fire pipes used were GI American standard class 5 (1" G.I Stell Welded Pipe ASTM A53, Grade B, Sch-40, 5.8 Mtr) and were bought from Musaffa fire Fighting NAFFCO -026263554.
- down sprigler 68 dgree qucik response
- Thermorstate proper setting.
- Fire Fighting pipes were not prperly hanged with U- clamp so problem came for adjusting at the level of ceiling. because clinent was asking for at the same level of ceiling
- Old Two number of machines were found blower motor faulty. so rewinded again ( Extra cost came - 500 rewinding + 500 for labour installation - loss of 1000 for our technician's labour cost).
- Connection of the Termostate switch was not done by the sub contractor because he said its not his job.
- Extra cost we had beared becuase old diffuser were not found any where
- Thermostate we had connected it was of other type than the required one.
( Through Al Ambar Interior Designing Company - Dubai)
- Supply and Installation of Fan coil Units - 02 Nos Carrier Fan Coil Units
- Supply and Installation of Chilled water pipe line connection.
- Supply and Installation of Ducting (GI Ducting with grills, pnion boxes, installation, grills, VCDs, Flexible ducts.)
- Supply and installation of Thermostate.and its electrical wiring for the control
Note:
- Chilled Water Pipeline Chemical Flushing and Pressure Testing , Pressure value = 12 Bar( Sample were need to approve from Water Bird - we done it one time
- Pressure testing was for both fire fighting and for the chilled water line.
- Fire pipes used were GI American standard class 5 and were bought from Musaffa fire Fighting NAFFCO (Contact Mr. Sunil).
- down sprigler 68 dgree qucik response
- Thermorstate proper setting.
- Fire Fighting pipes were not prperly hanged with U- clamp so problem came for adjusting at the level of ceiling. because clinent was asking for at the same level of ceiling.
- Big problem was We done the project with very low cost including machines installation and ducting jobs